MT ISA FILTER PLANT AND CONCENTRATOR UPGRADE
Scope
Provide the capital estimate and concept layout for a capacity upgrade to the zinc filter plant and the detailed design of the XYZ concentrator upgrade (flotation circuit) at Mt Isa Mine.
Description
Wave supported Glencore Zinc in Mt Isa on a number of upgrades:
Mt Isa Filter Plant Upgrade
Glencore required a capacity upgrade to the existing zinc filter plant, with Wave delivering:
- Engineering: concept, PFS and detailed design for the upgraded facility and associated materials handling and storage infrastructure
- Deliver: Project Management/Construction Management, site engineering and commissioning support
XYZ Concentrator Upgrade
Production at the zinc concentrator required an increase to 1Mtpa, with Wave delivering:
- Engineering: detailed design of the XYZ concentrator upgrade involving new pumps, pipes and associated infrastructure