Project History

Gabanintha Vanadium Project
Pre-Feasibility Study (PFS)

Scope

Wave International was engaged by TMT to deliver the project PFS and assist in the Management of expert subconsultants providing the mining, metallurgical and HSEC inputs for the PFS report. Wave’s roll to provide management, process and engineering in the development of generating data to support Wave’s Process design, financial Modelling, Operational costs, spares assessment and capital estimate. Structured planning prior to the commencement of Process, Engineering, Procurement and Document Control activities ensured that sufficient adequately skilled engineering and support resources would resulted in the delivery of the high-quality study in the time nominated and on budget.

Description

Wave International was appointed by Technology Metals Australia Limited (TMT) to prepare a Pre-Feasibility Study (PFS) for the Northern Block of tenements of the 100% owned Gabanintha Vanadium Project. The PFS targets a production rate of 13 kt/a of V2O5 product over a 13-year process LOM. The Pre-Feasibility Study has been developed to a confidence level of -15% to +25%. TMT and Wave has the aim of developing

Value Added

Waves management immediately identified through experience the key financial drivers for the project and immediately engaged additional effort in these areas;

  • Down Stream Processing
  • Energy Supply Strategy
  • Value adding offtake Products